Bathroom Remodeling in Missouri City.
Bathrooms fail from the inside out. In Missouri City homes we routinely open walls and find pan liners that were never lapped correctly, hot-mopped pans past their life, or vents dumping humidity into the attic. Getting waterproofing and ventilation right is the difference between a bath that lasts twenty years and one that fails in five.
Bathroom Remodeling in Missouri City, Texas typically costs $35,000–$65,000 for a mid-range primary bath and $75,000–$150,000 for a custom spa bath, and takes about 7 days on site for a straightforward bath with materials staged in advance, 3–6 weeks for a typical primary bath, and 8–12 weeks for a custom spa bath with relocated plumbing. Novara Construction is a general liability insured design-build contractor serving Missouri City, TX and surrounding Fort Bend & Harris Counties, handling design, permitting, and construction under one detailed written contract.
$35,000–$65,000 for a mid-range primary bath and $75,000–$150,000 for a custom spa bath.
Greater Houston market ranges, not a quote. Your number depends on scope, finish level, and existing conditions.
About 7 days on site for a straightforward bath with materials staged in advance, 3–6 weeks for a typical primary bath, and 8–12 weeks for a custom spa bath with relocated plumbing.
Permitting duration varies by jurisdiction — see below for who reviews work in Missouri City.
What's included
- Curbless and wet-room showers with linear drains
- Full waterproofing systems behind tile, not just backer board
- Freestanding tubs, double vanities, and custom storage
- Heated floors, steam, and dedicated ventilation
- Accessible and aging-in-place layouts with blocking for grab bars
Missouri City homes
Quail Valley, Vicksburg, and Hunters Glen date to the 1970s–80s: single-story ranches and two-stories with compartmentalized plans that respond well to whole-home renovation. Sienna, Lake Olympia, and the newer 77459 corridors are 2000s-and-newer builds where owners focus on kitchen re-engineering, spa primary baths, media rooms, and backyard structures.
We design the room around the plumbing you have or the plumbing you are willing to move, confirm slab or pier-and-beam access early, and detail the waterproofing assembly before a single tile is ordered.
Who reviews it
Most of the area permits through the City of Missouri City, with some addresses under Fort Bend County; Sienna and the golf-course communities add architectural review committees with real design standards. We prepare drawings to those standards and manage both the city permit and the HOA submittal.
- Sienna
- Quail Valley
- Lake Olympia
- Vicksburg
- Plantation Bend
- Hunters Glen
77459 · 77489
Not listed? Call and we'll confirm coverage for your address.
Missouri City questions
Can you do a curbless shower on a slab foundation?
Yes. It requires cutting and re-sloping the slab to recess the shower pan, which we plan for at design and price into the proposal — it is not a surprise change order.
How long does a bathroom remodel take?
A straightforward bath that keeps the existing plumbing locations, with every material on site before demo, is about 7 days on site. A typical primary bath with a new shower and tile runs 3–6 weeks. A custom spa bath with relocated plumbing, stone, or steam runs 8–12 weeks.
Do you work in Sienna?
Yes. We regularly design and build in Sienna and handle the community's architectural review along with City of Missouri City permitting.
What's the best renovation for a Quail Valley ranch?
Opening the kitchen and den into one living space, replacing original mechanical systems, and rebuilding the primary suite — the bones and lots are excellent.