Whole Home Remodel in West University.
A whole-home renovation is the only point at which you can fix the things you cannot see — wiring, ducts, insulation, and foundation movement — without paying twice for demolition and finishes. In West University that matters most on homes built before the current energy code.
Whole Home Remodel in West University, Texas typically costs $150–$275 per square foot for a full renovation, or $85–$130 per square foot for a cosmetic refresh, and takes 10–16 weeks of design and permitting, then 6–12 months on site. Novara Construction is a licensed, insured design-build contractor serving West University Place, TX and surrounding Harris County, handling design, permitting, and construction under one fixed-price contract.
$150–$275 per square foot for a full renovation, or $85–$130 per square foot for a cosmetic refresh.
Greater Houston market ranges, not a quote. Your number depends on scope, finish level, and existing conditions.
10–16 weeks of design and permitting, then 6–12 months on site.
Permitting duration varies by jurisdiction — see below for who reviews work in West University.
What's included
- Architect-led floor plan reworks and structural changes
- Full mechanical, electrical, and plumbing replacement
- Windows, insulation, and envelope upgrades for Gulf Coast humidity
- Kitchen, baths, flooring, millwork, and paint under one contract
- Foundation evaluation and leveling before finishes go in
West University homes
West U mixes 1930s–50s cottages with 1990s-and-newer two- and three-story rebuilds on 50-foot lots. Cottage owners typically want a kitchen and bath modernization plus a rear or second-story addition; newer-home owners want kitchen re-engineering, primary bath rebuilds, and better outdoor space in a small backyard.
Design and documents first, then a single fixed-price contract, then a sequenced build with one project manager and a live schedule you can check any day of the week.
Who reviews it
The City of West University Place has its own building department with tight lot coverage, height, setback, and tree rules, and construction hours are enforced. We design to those limits and manage permits, inspections, and neighbor notification so the project stays on schedule.
- West University Place
- Southside Place
- Braeswood
- Bellaire border
- Rice Village area
77005 · 77025
Not listed? Call and we'll confirm coverage for your address.
West University questions
Should we move out during the work?
For a full renovation, yes — it is faster, safer, and usually cheaper than phasing around an occupied house. For a partial remodel we can phase the work and keep a functioning kitchen and bath.
Is it cheaper to renovate or build new?
In most established West University neighborhoods, renovating is cheaper per square foot than tearing down and rebuilding, and it preserves the lot value. Once you are replacing the foundation and the entire envelope, the math moves toward new construction.
Can I add a second story in West U?
Frequently, subject to height, setback, and coverage limits and the existing foundation and framing capacity. We verify feasibility during design.
How do you manage construction on a narrow lot?
Staged deliveries, controlled staging areas, protected sidewalks and trees, and strict adherence to permitted work hours.